Sustainable Methanol Manufacturing
30,000 tonnes per year of sustainable e-methanol from captured CO₂ and green hydrogen—supporting maritime fuel transition and industrial decarbonization
Project Overview
Secorra develops and deploys sustainable methanol facilities that convert captured CO₂ and green hydrogen into e-methanol for low-carbon marine fuels and industrial feedstock. Our facilities utilize proven CRI ETL® synthesis technology with modular design for scalable deployment.
Production Capacity
Core Technology Stack
Carbon Capture
High-efficiency capture system sized for ~42,000 t/year CO₂
H₂ Electrolyser
~36.4 MW PEM/ALK electrolyser producing 17.3 t/day hydrogen
Methanol Synthesis
CRI ETL® technology with 90% availability target over 30-year design life
Key Feedstock Inputs
CO₂
127.9 tonnes/day continuous supply required for 24/7 operation
H₂
17.3 tonnes/day green hydrogen from electrolysis
Power
~36.4 MW for electrolyser + ~2.7 MW ETL process load
Steam
LP steam demand: ~2.5 tonnes/hour
Technical Performance
>97% CO₂ Conversion
High-efficiency conversion of captured carbon dioxide
>99% H₂ Conversion
Exceptional hydrogen utilization efficiency
90% Availability Target
30-year operational design life with high reliability
ASTM AA / IMPCA Grade
Methanol output meets premium industry specifications
Site & Infrastructure
| Parameter | Specification |
|---|---|
| Site Footprint | ~3,400 m² (optimized layout) |
| Design Type | Modular design for scalability |
| Operational Life | 30 years (design basis) |
| Availability | 90% target availability |
| Construction Timeline | 3-year program (2026-2029 reference) |
| Technology Provider | CRI ETL® synthesis technology |
Market Opportunity & ESG Drivers
Policy Tailwinds
EU Fit-for-55 & FuelEU Maritime regulatory mandates creating guaranteed demand and carbon price exposure upside
ESG Impact
Circular carbon economy model utilizing ~42,000 tonnes CO₂/year with local air quality benefits from oxygen valorization
Project Timeline
Development Phase
FEED, permitting, regulatory approvals, and offtake LOIs
FID & Procurement
Final Investment Decision, detailed engineering, and long-lead equipment procurement
Construction
Site preparation, equipment installation, and piping interconnection
Operations
Commissioning, performance testing, and production ramp-up to nameplate capacity
Explore Sustainable Methanol Opportunities
Contact us to discuss how Secorra can develop and deploy sustainable methanol projects that support your decarbonization goals and access to green fuels